Photo Gallery

Lewes home full remodel

This was a multi home remodel that started in 2022 and ended in 2024. We cleaned out the house and replaced all the flooring. We closed in the loft area and installed two custom wood windows, an accent wall was dressed up with panels and painted. The flooring throughout the house is new luxury vinyl plank flooring and carpet on the stairs. We came back and remodeled all the bathrooms throughout the home. We remodeled the kitchen with new KraftMaid cabinets and a stone top. The deck was removed, and a new deck was installed with a built in jacuzzi and screen porch – wolf decking and wolf vinyl rails, screen porch panels by Atlantic Aluminum